Hosting & Server Migration - Service
Starting from
Rp 3.750.000 Rp 2.500.000 -33% ≈ US$136
Following year /year* *Estimate; it may vary with usage, such as storage capacity and more.
Prices include tax.
Scope and cost are agreed before work begins
- Estimated Time 2–5 hari kerja untuk sampai 5 situs; di atas itu dijadwalkan bergelombang
- Work Process Jarak jauh lewat SSH pada kedua server
- After Handover 14 hari penanganan masalah pasca-pindah; server lama disarankan tetap hidup selama masa itu
- Consult First Scope and cost agreed before starting.
Hosting & Server Migration - Service
Pindah penyedia atau panel tanpa ada subdomain, cron, atau kotak surel yang tertinggal
Estimated Time2–5 hari kerja untuk sampai 5 situs; di atas itu dijadwalkan bergelombang
Work ProcessJarak jauh lewat SSH pada kedua server
Best QualityDeveloped by ArtonLabs.
Switching providers or switching panels is usually delayed not because it is difficult, but because of the fear that something will be left behind: one subdomain, one cron, one email box.
This service starts with a written inventory. That way, everything that is moved can be matched one by one at the end, and the old site stays live until the new site passes your inspection.
What we do
- Written inventory. We record everything that needs to be moved, including subdomains, crons, and email boxes.
- Site migration. WordPress, OJS, and legacy PHP applications are moved, including between different panels.
- Final matching. The migration results are matched one by one against the inventory.
What you receive
- Written inventory. A list that serves as a shared reference for everything that is moved.
- Site in the new place. A site that has been moved and matched against the inventory.
- Safe transition. The old site stays live until the new site passes your inspection.
Workflow
- We compile a written inventory of everything in the old place.
- The site is moved to the new provider or panel, while the old site stays live.
- The results are matched one by one against the inventory.
- You check the new site. The old site is kept until the new site passes your inspection.
Suitable for
- Institutions that want to switch hosting providers but are worried something will be left behind.
- Administrators who are changing server panels with many sites at once.
- Owners of a mix of WordPress, OJS, and legacy PHP applications.
Good to know
- We have moved dozens of sites in one wave, including WordPress, OJS, and legacy PHP applications, between different panels.
- Migration requires access to the old place and the new place.
- Inventaris situs, basis data, cron, dan kotak surel di server sumber.
- Pemindahan berkas dan basis data ke server tujuan.
- Penyesuaian konfigurasi web server dan versi PHP per situs.
- Penerbitan ulang sertifikat HTTPS.
- Pemindahan atau penyiapan ulang penjadwalan tugas.
- Pengubahan DNS dan pemantauan masa transisi.
- Pencocokan akhir terhadap daftar inventaris.
- Estimated time
- 2–5 hari kerja untuk sampai 5 situs; di atas itu dijadwalkan bergelombang
- Working method
- Jarak jauh lewat SSH pada kedua server
- Stage 1
- Inventaris dan rencana urutan pindah.
- Stage 2
- Pemindahan ke server tujuan dan pengujian lewat berkas host.
- Stage 3
- Pengubahan DNS pada jadwal yang disepakati.
- Stage 4
- Pemantauan dan pencocokan akhir.
- After handover
- 14 hari penanganan masalah pasca-pindah; server lama disarankan tetap hidup selama masa itu
The displayed price is a starting price. Final scope and cost are agreed upon through conversation before work begins.
- Akses SSH pada server sumber dan server tujuan.
- Akses pengelola DNS domain.
- Daftar situs yang ikut pindah dan yang sengaja ditinggalkan.
Not included
- Biaya server atau lisensi panel tujuan.
- Pemutakhiran kode aplikasi lama yang tidak jalan di PHP baru — dinilai terpisah.