Home Blog Store
OJS Migration & Upgrade - Service
Services 191 Viewed

OJS Migration & Upgrade - Service

Starting from Rp 6.750.000 Rp 4.500.000 -33% ≈ US$246

Prices include tax.

Scope and cost are agreed before work begins
  • Estimated Time 5–10 hari kerja, bergantung jumlah terbitan
  • Work Process Jarak jauh; cutover dijadwalkan di luar jam sibuk
  • After Handover 30 hari penanganan masalah yang timbul akibat migrasi
  • Consult First Scope and cost agreed before starting.
OJS Migration & Upgrade - Service Pindahkan atau mutakhirkan OJS dengan terbitan lama, DOI, dan tautan tetap hidup
Estimated Time5–10 hari kerja, bergantung jumlah terbitan
Work ProcessJarak jauh; cutover dijadwalkan di luar jam sibuk
Best QualityDeveloped by ArtonLabs.

Moving a running journal is far riskier than installing a new one. There are old issues, registered DOIs, and links that people have already cited.

This service moves your OJS to a new version, to another server, or both, while keeping old links alive.

What we do

  • OJS upgrade. Journals are moved from OJS 2 to OJS 3.
  • Server move. Journals are moved between servers, or upgraded at the same time.
  • Old links stay alive. Links that people have already cited still point to the correct article.
  • Work on a copy. Work always starts on a copy, not on the live site.

What you get

  • Test address. You check the migration result first at a test address.
  • Journal on the new version or server. Old issues move along, and old links stay alive.
  • Switchover on your schedule. The switch to the real address is done after you agree, at the hour you choose.

Workflow

  1. We make a copy of the journal; the live site is not touched.
  2. The migration or upgrade is done on that copy.
  3. You check the result at the test address.
  4. After you agree, the switch to the real address is done at the hour you choose.

Suitable for

  • Journals still using OJS 2 that want to move to OJS 3.
  • Journals that need to move servers without breaking links that have already been cited.
  • Journal managers with many old issues and registered DOIs.

Good to know

  • Paths handled: from OJS 2.4 to 3.x, between servers, or both.
  • The switch to the real address is only done after you approve the result at the test address.
  • Audit versi, ukuran basis data, plugin, dan tema terpasang.
  • Pemindahan berkas dan basis data ke lingkungan uji.
  • Pemutakhiran bertahap mengikuti jalur resmi OJS.
  • Perbaikan metadata dan galley yang rusak selama pemutakhiran.
  • Pemetaan URL lama ke baru beserta pengalihan 301 agar sitasi tidak mati.
  • Pemeriksaan DOI dan pendaftaran ulang bila diperlukan.
  • Pergantian alamat (cutover) pada jadwal yang Anda tentukan.
Estimated time
5–10 hari kerja, bergantung jumlah terbitan
Working method
Jarak jauh; cutover dijadwalkan di luar jam sibuk
Stage 1
Audit dan perkiraan risiko.
Stage 2
Migrasi ke lingkungan uji.
Stage 3
Pemeriksaan bersama Anda di alamat uji.
Stage 4
Cutover dan pemantauan pasca-pindah.
After handover
30 hari penanganan masalah yang timbul akibat migrasi

The displayed price is a starting price. Final scope and cost are agreed upon through conversation before work begins.

  • Akses ke server lama (SSH/FTP dan basis data) dan server tujuan.
  • Izin menghentikan pengiriman naskah sementara saat cutover.
  • Daftar plugin yang wajib tetap berfungsi setelah pindah.

Not included

  • Penulisan ulang tema lama yang tidak kompatibel dengan OJS 3.
  • Pemulihan data yang memang tidak ada di cadangan sumber.